Tuesday, March 24, 2009

So many ideas so little time.

Lately I have not been updating my blog as much as I would like. I have been working on many ideas and projects that I have not updated to the blog. The stairs that I built for Brad have been turned over to him so that he may do the woodwork and some more planning on how he wants certain elements. The Wankel Bell has been approved ! That means its time to get started rounding up donations and refining the plan. The Super Kiln is well under way with Randall installing the heating elements and the insulation pieces. I have had several ideas to better the remaining parts needed for the kiln and a full 3D rendering should be completed by the end of this weekend. A local steel yard Glaser steel has enlisted my help on improving a kettle corn machine for one of their valued customers as well as requesting that I figure out how to cut 7' lengths of pipe down the center length wise at a rate of at least three lengths per hour for a separate project. Cutting the pipe length wise led me to re open the design for my super cutting and fabrication table. This table holds several tools and provides a stable working platform with any luck it will be operational by the end of the week although due to its complexity the end product may not be finished for a while. Detailed descriptions and images on some projects by weeks end.
Sent via BlackBerry from T-Mobile

No comments:

Post a Comment

 
/* Use this with templates/template-twocol.html */